Multiple services were experiencing issues in the europe-west2 region.

Severity: Critical
Category: Hardware
Service: GCP

This summary is created by Generative AI and may differ from the actual content.

Overview

On Monday, 19 October 2026 at 22:53 US/Pacific, an external underground cable fault on the utility network caused a power disruption to primary utility feed A at the data center facility hosting europe-west2-b zone. The facility was in a temporary single-feed (1N) maintenance posture with utility feed B isolated for repairs following issues identified during a quarterly generator load test on 14 October 2026. When primary utility feed A was lost, the facility's Programmable Logic Controller (PLC) failed to automatically start the emergency generators due to a misconfiguration: the PLC undervoltage sensing inputs were wired upstream of the isolated utility feed B breaker, causing the PLC to sense live upstream voltage on the disconnected path and incorrectly indicate that a healthy utility source was available, preventing generator startup. The facility's static UPS battery banks (with 5 minutes of autonomous runtime) carried the critical load until battery reserves depleted at 23:00 US/Pacific, resulting in complete power loss across data halls. This caused instances, database replicas, and worker nodes in europe-west2-b to become immediately unreachable. Regional traffic-routing mechanisms initiated automated failover toward adjacent availability zones, but the sudden influx of redirected workloads saturated available compute capacity in other zones, creating elevated admission queues and intermittent 500 and 503 API errors across the europe-west2 region. Utility power was restored via standby utility source at 23:54 US/Pacific, with datahall power restoration completed at 00:20 US/Pacific on 20 October. Following PLC reconfiguration and validation, controlled traffic re-admission began at 03:45 US/Pacific, with majority workload recovery achieved by 05:08 US/Pacific (99.5% of GCE VMs operational) and closure notification posted by 07:03 US/Pacific. The incident lasted 6 hours and 8 minutes, affecting 35+ Google Cloud Platform services in the europe-west2 region.

Impact

Severe regional outage lasting 6 hours 8 minutes affecting 35+ Google Cloud Platform services in europe-west2 region. During initial phase (5 hours 29 minutes), customers experienced complete unavailability of zone-scoped resources in europe-west2-b including Compute Engine VM instances, Persistent Disk, GKE zonal clusters, Cloud SQL non-HA instances, AlloyDB basic primaries, and Bigtable single-cluster instances. Multi-zonal and regional services spanning europe-west2 experienced elevated latency, transient API errors (HTTP 500 and 503), and task admission queuing. Some customers in unimpacted zones (europe-west2-a and europe-west2-c) also experienced unexpected degradation due to instantaneous demand surges and control-plane dependencies across zonal boundaries. Storage write operations experienced transient error rates during initial failover period. By 04:46 US/Pacific new VM creation resumed, and by 05:08 US/Pacific over 99% of Compute Engine Virtual Machines were in healthy state. Workloads and resources hosted entirely within europe-west2-b became unreachable, with some failovers unsuccessful due to capacity constraints and storage replication difficulties.

Trigger

External underground cable fault on the utility network outside the data center facility caused loss of primary utility feed A at 22:53 US/Pacific on 19 October 2026. This occurred while the facility was in temporary single-feed (1N) maintenance posture with utility feed B physically isolated and locked out for corrective repairs following issues identified during a quarterly generator load test on 14 October 2026. The loss of the primary utility feed A, combined with the unavailability of feed B due to maintenance isolation, triggered the need for automatic generator startup and load transfer.

Detection

Google engineers were alerted to the disruption via automated monitoring systems and probers at 23:04 US/Pacific on 19 October (4 minutes after power loss at 23:00 US/Pacific), which detected elevated API error ratios, job submission timeouts, and loss of infrastructure reachability in zone europe-west2-b. Engineering teams immediately mobilized to isolate the affected infrastructure and commence recovery operations.

Resolution

Onsite facility teams transferred the facility load to the standby utility source at 23:54 US/Pacific, restoring critical load once UPS batteries depleted. Utility power was re-established to datahalls at 00:20 US/Pacific on 20 October. Site operations and engineering teams completed reset and testing of emergency backup generator automation controllers. Google engineers isolated the offline availability zone by adjusting regional service routing away from affected infrastructure. Engineers adjusted scheduler allocations and capacity limits across unimpacted infrastructure to prioritize active customer reservations and relieve queue backlogs. Clusters began recovery at 00:40 US/Pacific, network devices came back online at 00:45 US/Pacific, and storage recovery began at 00:50 US/Pacific. Power redundancy was verified at 03:13 US/Pacific. Controlled traffic re-admission began at 03:45 US/Pacific with gradual, controlled re-admission back to zone europe-west2-b. By 04:11 US/Pacific Google Cloud Platform services and APIs were fully available to customers. By 05:08 US/Pacific majority workload recovery was achieved with 99.5% of GCE VMs operational and new VM creation fully supported. Comprehensive remediation actions included: restoration of normal utility configuration (both A & B feeds), utility provider cable fault repair (estimated completion 30 October), PLC reconfiguration and validation (completed 26 October), comprehensive PLC code review and system resiliency testing (estimated 31 October), Emergency Operating Procedures documentation update (completed 26 October), and strengthened change management with elevated approvals for data center configuration changes (estimated 30 October).

Root Cause

Misconfiguration of the Programmable Logic Controller (PLC) logic that did not properly verify both an undervoltage condition and physical breaker position for both utility feeders. Specifically, the PLC undervoltage sensing inputs were wired upstream (line side) of the isolated utility feed B breaker. When primary utility feed A was lost, the PLC was programmed to verify whether voltage was present on the feeder before commanding a generator start. Because utility feed B remained energized upstream of the disconnected breaker (due to maintenance isolation), both PLCs sensed live upstream voltage on the disconnected path. As a result, the PLC logic incorrectly indicated that a healthy utility source was available, even though both the primary and secondary distribution feeds were de-energized, and did not issue a start command to the generator plant. This PLC misconfiguration, combined with the facility being in temporary single-feed (1N) maintenance posture with feed B isolated for repairs, prevented automatic generator startup when the primary utility feed A failed due to an external underground cable fault on the utility network.